TerraRevive for wellsite and pipeline reclamation, made in Alberta

A pellet for stripped and disturbed soil.

We make TerraRevive in Sundre, Alberta. It's built to help disturbed ground get a catch.

Totes of pellets on a truck at a reclamation site
01The problem

Stripped ground doesn't hold a stand on its own.

  • 01Topsoil's gone, or there wasn't much to begin with.
  • 02The catch came in thin.
  • 03You need to show the landowner and the AER it worked.
Pellet totes beside a seeder on a reclamation site
02How it goes on

A dry pellet, rated for your site.

Rates start at 1,500 lb/ac. Every site is different, so we set your rate when we quote.

FormPellet
Guaranteed analysis8.5-2-1
Organic matter79.5% (lab tested, April 2026)[Pending Lee OK]
Heavy metalsArsenic, cadmium and mercury below detection, other metals low (lab tested, April 2026)[Pending Lee OK]
Starting rate1,500 lb/ac
Packaging1,500 lb totes
Made inSundre, Alberta
Totes on a flatdeck in the Sundre yardPellets pouring from a tote
03Why TerraRevive

AER reclamation requirements, in plain words.

The AER won't let you assess vegetation until at least two years after your last amendment. We'll walk you through what that means for your timeline.

A reclamation soil amendment made and tested in Alberta.

We make it at our plant in Sundre. It was trialled on an Alberta reclamation site against an untreated control, and assessed by a professional agrologist for cover and plant density.

For wellsite reclamation and a poor catch.

TerraRevive is an 8.5-2-1 dry pellet, with rates starting at 1,500 lb/ac. It doesn't replace topsoil. It builds soil health in the ground you've got, with slow-release nitrogen, organic matter and food for soil biology. Tell us about your site and we'll give you a rate and a quote.

Pellets on bare soilA picker lifting a tote on site
05Questions

Does TerraRevive shorten the AER timeline?

No product can do that. The AER still sets the timeline. Organic amendments need the landowner's written OK and have to be recorded. And the vegetation assessment waits at least two years after the last application. What TerraRevive does is build the health of the soil you've got.

06Restoration

How a reclamation job goes with us.

From the first call to the vegetation assessment, here's the order things happen in. See how a job goes.

07Document pack

Your paperwork in one place.

Guaranteed analysis 8.5-2-1, backed by an accredited lab test. The label, Safety Data Sheet and lab results are available on request.

LabelCFIA Exempt, 8.5-2-1Available on request
SDSSafety Data SheetAvailable on request
Lab analysisAccredited lab, April 2026Available on request
Reclamation quote

Tell us about your site. We'll help you get the soil working again.